What this topic covers
Public works for the Law and Business Examination: what counts as a public work, contractor registration, prevailing wages, certified payroll records, apprentices, hours, workers' compensation certification, payment bonds and retention. These are original practice notes, not materials of the CSLB or PSI, based on California texts in force on January 1, 2027, as read in November 2026. Dollar thresholds and percentages are those of that text and can change.
Public works and registration
- Public works: construction, alteration, demolition, installation or repair done under contract and paid for in whole or in part out of public funds (Labor Code section 1720).
- Own forces: work a public agency performs with its own employees is not subject to the prevailing wage requirement (Labor Code section 1771).
- Prevailing wage exemption: public works projects of $1,000 or less (Labor Code section 1771).
- DIR registration: renewed on or before July 1 of each year; an unregistered contractor may not bid on or perform public work (Labor Code section 1725.5).
- Registration exemption: $25,000 or less for construction, alteration, demolition, installation or repair, and $15,000 or less for maintenance (Labor Code section 1725.5); prevailing wages may still be owed.
Prevailing wage
- Rates: the awarding body obtains them from the Director of Industrial Relations (Labor Code section 1773).
- Posting: the awarding body posts a copy of the determination at each job site (Labor Code section 1773.2).
- Subcontractor affidavit: before final payment, the prime contractor obtains a sworn affidavit that the subcontractor paid the prevailing rate (Labor Code section 1775).
Certified payroll records
- Request: the contractor has 10 days after a written request to produce the records; penalties then run per calendar day and per worker (Labor Code section 1776).
- Change of address: notice within five working days of a change in where the records are kept (Labor Code section 1776).
Apprentices, hours and insurance
- Apprentice ratio: never less than one hour of apprentice work for every five hours of journeyman work (Labor Code section 1777.5).
- Hours: 8 hours a day and 40 a week (Labor Code section 1811); longer days are allowed when hours over 8 are paid at not less than 1 1/2 times the basic rate (Labor Code section 1815).
- Workers' compensation certification: signed and filed with the awarding body before performing the work (Labor Code section 1861).
Bonds, retention and debarment
- Payment bond: required for a contract involving an expenditure over $25,000 (Civil Code section 9550).
- Retention: at most 5 percent of each payment and of the contract price; a subcontract may not exceed the prime contract percentage, and no party may require a waiver (Public Contract Code section 7201).
- Debarred subcontractor: the contract is void as a matter of law; the contractor answers for the workers' wages and amounts paid go back to the awarding body (Public Contract Code section 6109).
Common traps
- Thresholds: $1,000 is the prevailing wage exemption; $15,000 and $25,000 are registration exemptions; $25,000 is also the payment bond threshold.
- Periods: 10 days is for producing records, five working days for a change of address.
- Who does what: the Director of Industrial Relations sets rates; the awarding body specifies and posts them.
Sample questions (5)
1. Under Labor Code section 1720, which BEST describes “public works”?
- Any work performed on land owned by a public agency, no matter who pays for it or hires the crew
- Construction work that a public agency performs using its own employees, equipment, and funds
- Any private project that a public agency inspects, regulates, and issues building permits for
- Construction or repair work done under contract and paid for at least partly with public funds
Labor Code section 1720(a)(1) defines public works as “Construction, alteration, demolition, installation, or repair work done under contract and paid for in whole or in part out of public funds”. Land ownership alone does not make work a public work. Work a public agency performs with its own employees is not done under contract, and section 1771 makes the prevailing wage requirement inapplicable to work carried out by a public agency with its own forces. A permit or inspection by a public agency does not involve public funds.
2. What is the MAXIMUM public works project amount that is exempt from the prevailing wage requirement under Labor Code section 1771?
- $1,000
- $15,000
- $25,000
- $100,000
Labor Code section 1771 requires prevailing wages “Except for public works projects of one thousand dollars ($1,000) or less”. The $15,000 and $25,000 figures are the registration exemption amounts in section 1725.5(f), not the exemption in section 1771, and $100,000 appears in neither section. Amount from the Labor Code text read on 11/13/2026.
3. Under Labor Code section 1725.5, by what date each year must a contractor pay the renewal fee for its DIR public works registration?
- On or before January 1
- On or before March 1
- On or before July 1
- On or before October 1
Labor Code section 1725.5(a)(1) requires an annual renewal fee “on or before July 1 of each year thereafter”, and under subdivision (c) a contractor that misses it may not bid on or perform public work until it is registered again. March 1 and January 1 appear in section 1725.5(e) only as the 2015 and 2018 starting dates of the registration requirements, not as renewal dates, and October 1 is not a date in section 1725.5.
4. A city hires Bayview Builders, Inc., a licensed contractor, under a $20,000 contract to build a new storage shed at a city park. Bayview is not registered with the DIR. Under Labor Code section 1725.5, is registration required?
- Yes, because construction projects over $15,000 require registration
- No, because construction projects of $25,000 or less are exempt
- Yes, because any public works project over $1,000 requires registration
- No, because the city may waive registration for a licensed contractor
Labor Code section 1725.5(f) says the section does not apply to work on a public works project of “twenty-five thousand dollars ($25,000) or less when the project is for construction, alteration, demolition, installation, or repair work”, so the $20,000 shed contract does not require registration. The $15,000 limit in subdivision (f) applies to maintenance work, not to construction. The $1,000 figure is the prevailing wage exemption in section 1771, not a registration threshold, so prevailing wages are still owed on this project. Nothing in section 1725.5 lets an awarding body waive registration. Amounts from the Labor Code text read on 11/13/2026.
5. Who determines the general prevailing rate of per diem wages for each craft in a locality for public works contracts?
- The public body awarding the contract
- The office of the Labor Commissioner
- The Registrar of Contractors' office
- The Director of Industrial Relations
Labor Code section 1773 requires the body awarding a contract to obtain the general prevailing rate of per diem wages “from the Director of Industrial Relations”. The awarding body obtains and specifies the rates rather than setting them. Neither the Labor Commissioner's office nor the Registrar of Contractors determines the rates.