Practice questions written by us, with the correct answer and the rule cited. They are not official questions.
1. Which type of drawing shows a vertical cut through a building to reveal its internal construction?
A building section is an imaginary vertical cut that reveals framing, floor and roof assemblies and heights. A floor plan is a horizontal cut viewed from above, an exterior elevation shows only the outside face of the building, and a roof plan shows the roof from above.
2. A contractor license is issued in March. It expires how long after the last day of March unless it is renewed?
Business and Professions Code section 7140 provides that licenses “expire two years from the last day of the month in which the license is issued”, and an unexpired license is renewed for a further two-year period. Twelve, eighteen and thirty-six months are not the license period set by section 7140.
3. Which soil condition is MOST likely to cause seasonal heaving and cracking of a slab-on-grade foundation?
Expansive clay swells when it takes on moisture and shrinks as it dries, which lifts and cracks slabs and footings that rest on it. Coarse sand drains freely and does not swell, well-graded gravel is stable and low in fines, and a compacted crushed rock base is a standard stable support under a slab.
4. Within how many calendar days must an employer report a newly hired employee to the EDD on the DE 34?
Section 1088.5(d)(1) of the Unemployment Insurance Code requires the report “within 20 days of hiring any employee”, and the EDD DE 44 counts 20 calendar days from the start-of-work date. Ten days is shorter than the period allowed, while 30 and 45 days are later than the deadline.
5. Sierra Ridge Builders finds a 2x10 floor joist with a long split through its depth near midspan. What is the BEST repair?
A through-split reduces the joist's capacity in shear and bending, so the joist is reinforced by sistering a full-length joist beside it, fastened as the designer or code requires. Caulk fills the gap but adds no strength. A plywood patch cannot carry the bending in a cut-out joist. One extra nail does not restore the lost capacity.
6. When a licensee's required workers' compensation coverage lapses, the automatic license suspension under Business and Professions Code section 7125.2 is effective on which date?
Section 7125.2 makes the suspension effective by operation of law on the date the coverage lapses (or on the date coverage is required to be obtained, whichever is earlier). The 45 days in the section is the longest time a pending suspension is posted before suspension periods are posted, not a delay in the effective date. Neither the Registrar's notice nor a hearing date controls.
7. If no retaining devices are used, how far from the edge of an excavation must excavated material and equipment be kept?
Title 8, section 1541 requires placing and keeping materials or equipment “at least 2 feet from the edge of excavations”, or using retaining devices that prevent them from falling or rolling in. Six inches and 1 foot are closer than the section allows, and 4 feet is farther than it requires.
8. When must a contractor give the homeowner a copy of the home improvement contract signed and dated by both parties?
Section 7159 provides: “Before any work is started, the contractor shall give the buyer a copy of the contract”, signed and dated by both parties. A copy delivered after work starts, with the first progress payment or at the final walkthrough comes too late under section 7159.